Yes, well, there's a Selkirk in the way! The joist on the right is single, but the hanger sits on the old post, so there!
Saturday, 24 April 2021
Saturday, 17 April 2021
Friday, 16 April 2021
Splicing the Mainbrace
When they put the chimney in the kitchen, they dealt with the joist by simply cutting a few feet out of it. I've sandwiched it between two 2 by 8s, replaced the missing section, and glued and bolted everything together. It should take the bounce out of the upstairs bedroom.
Sunday, 11 April 2021
Hidden Chimney
Hidden above the kitchen ceiling was a chimney. They added a vent next to it, which is curious--why make another hole in the floor when there's one there already? Here it is, with the bricks and tin pipe removed.
Wednesday, 17 March 2021
Ice
The icicles have been growing--I like to think it is a sign that the temperatures are warm enough to allow melting. We are deep in a cold spell, with night temperatures around -20C.
Monday, 15 March 2021
Sunday, 7 March 2021
Camping In
This is our interim kitchen--our old countertop and sink mounted on some trestles and hooked up to the new plumbing. Well, it will have to do for the time being.
Subscribe to:
Posts (Atom)








