The repair work on the workshop foundation continues. On the 10th, Boris finished the excavation work, and then on the 12th, I poured a footing (25 bags @ 30kg), to which Jo and I added another 25-bag wall section on the 25th. The rebar comes up right under the sill, the stone having collapses inward.